by peaceandfreedom » Fri Nov 15, 2019 9:05 pm
Completely removing the floorboards on my Freedom 28 CK (keel version) was a big undertaking, because the floorboards extend way underneath the Port and STB settees. For me, this meant totally disassembling the entire cabin, from the head back.
If I were to do this job over again,and the settees were in good shape, I would cut vertically along all settees with a vibratory tool to keep the settees intact. I also used the vibratory saw to cut through screws I could not remove conventionally. BTW, my second F28CK has the same added lead on the port side as the lead that started this thread.
Happy sailing
Jim D.